This is excavation week at Beacon. It turns out Beacon’s backyard is composed of layers of sand and clay, that will require deeper excavation and a treatment of the holes with a “slurry” of concrete to stabilize the new foundations. Lots of digging is going on!
Videos of the digging activity!